The FM Management Plan is one of the defining elements of an R2-certified Facility. Let's begin by looking at why FM Management Plans are required to start at the equipment level. 

TELL THE STORY 

Remember, the FM Management Plan should tell the story of what happens to the equipment and components containing Focus Materials at the R2 Facility and through the downstream chain. This story takes the equipment from being R2 Controlled to either Functional products or Unrestricted Streams. Because different types of equipment containing Focus Materials require different processes, the FM Management Plan must be specific for each equipment type.  

For example, the FM Management Plan's description of processing smart phones will differ from the description of processing desktop computers. We all understand that nearly everything coming in the door at an R2 Facility has FMs, so unless your Facility handles only very exclusive material, such as a CRT glass recycler who only receives CRT glass or a cell phone refurbisher who receives only cell phones, you should expect to list a lot of whole electronics in the FM Management Plan, like laptops, desktops, printers, and phones. 

DOWNSTREAM VENDOR FLOWCHART 

To get a better understanding, let’s take a brief look at the wording of the standard. Notice that the FM Management Plan requirements are broken into three sections.  

Let’s start with section three, the downstream recycling chain flowchart. It says that an FM Management Plan shall include: 

3. When not the final point of processing, a flowchart of the downstream recycling chain selected according to Appendix A – Downstream Recycling Chain, including identification of international movements, to either final disposition or the first downstream R2 Certified facility. 

This chart must list all facilities in the recycling chain down to – and including – the final disposition facility or the first R2 Facility in the chain. Note that, since facilities are location based, this flowchart must also have the specific address of each downstream listed with the facility name. Note also that this flowchart should include all R2 Controlled Streams, not only those containing FMs. 

EXPERTISE, CAPABILITIES, METHODS, & CAPACITY 

Let’s move on to sections one and two. Here, the R2v3 Standard requires the FM Management Plan to include: 

1. The demonstrated expertise and capabilities required to process each type of electronic equipment containing an FM, and

2. The planned methods and demonstrated capacity needed to process each type of electronic equipment containing  an FM, and

Pay special attention here. The Standard requires Facilities to indicate the: 

  • expertise, 
  • capabilities,   
  • methods, and   
  • capacity 

to process each type of electronic equipment containing an FM.This is how a Facility tells the story of each equipment type.  

Remember, the FM Management Plan should not simply list out the FMs that are accepted and processed. The standard requires the FM Management Plan to address each TYPE of electronic equipment containing an FM. Facilities need to indicate what they are doing with each type, because it is going to be different depending on what their expertise and capabilities are,  the method of processing, and how much they are able to process in a given amount of time. 

Suppose there is a Facility with the following scope statement: 

Downstream Vendor Management, Logical Data Sanitization, and Testing and Repairing of Laptops, Monitors, and Smartphones 

The scope statement gives some idea of what is happening at the facility, but what types of processes are they doing with the smartphones? Are they replacing batteries in laptops and smartphones? What kind of monitors? Flat-panels, CRTs, or both? What are they doing with the monitors? The FM Management Plan will help others to know what they could expect to see at the Facility. 

Breaking down the scope by equipment-type, we can see that there are some common types of electronics containing FMs. 

EQUIPMENT TYPE FMs IN EQUIPMENT TYPE
LAPTOPS
  • Circuit Boards
  • Batteries
  • Mercury
FLAT-PANEL MONITORS
  • Circuit Boards
  • Mercury
SMARTPHONES
  • Circuit Boards
  • Batteries

Laptops often have circuit boards, batteries, and mercury. 

Flat-panel monitors have been known to hold circuit boards and mercury. 

Smartphones generally contain circuit boards and batteries. 

PLANNED PROCESSING METHODS 

The methods for each of these equipment-types will probably look a bit different, and the processes may even be done in different departments.  

For example, the Facility may test each of these equipment-types and may perform logical data sanitization for only the laptops and smartphones, but not for the monitors. In addition, they may “repair” laptops by replacing any bad batteries. In this case, their FM Management Plan might look something like this. Notice that the methods show how the Facility plans to bring the FM-containing equipment from R2-controlled to functional or unrestricted. 

EQUIPMENT TYPE FMs IN EQUIPMENT TYPE METHODS
LAPTOPS
  • Circuit Boards
  • Batteries
  • Mercury
– Testing & Repairing

– Logical Data Sanitization (Wiping)

– Sorting & Sending Downstream

– Remove swollen batteries & package to be sent to DSV

FLAT-PANEL MONITORS
  • Circuit Boards
  • Mercury
– Testing

– Sorting & Sending Downstream

SMARTPHONES
  • Circuit Boards
  • Batteries
– Testing

– Logical Data Sanitization (Wiping)

– Sorting & Sending Downstream

PLANNED CAPACITY 

For simplicity, let’s follow the Laptops in the example FM Management Plan. 

There are going to be constraints to the CAPACITY the R2 Facility can process. R2 Facilities are required to demonstrate that capacity, which should be indicated as a QUANTITY in a specified amount of TIME. Think about what the limiting factors are. 

These could include: 

  • restraints on space due to Facility Size 
  • or the Employee Count and the amount of material the employees are able to process 
  • or even limitations given by Regulatory Agencies for the amount of a certain material allowed on-site in a given amount of time.  

Note that the FM Management Plan may not indicate WHAT the limiting factors to the capacity are – it may simply say what the capacity IS. Capacity may also be indicated elsewhere, such as in the R2 Facility’s Closure Plan. This does not mean it can be left out of the FM Management Plan. 

EQUIPMENT TYPE FMs IN EQUIPMENT TYPE METHODS CAPACITY (qty/time)
LAPTOPS
  • Circuit Boards
  • Batteries
  • Mercury
– Testing & Reporting

– Logical Data Sanitization (Wiping)

– Sorting & Sending Downstream

– Remove swollen  batteries & package to be sent to DSV

XX Equipment / Week

XX Equipment / Week

XX Equipment / Week

XX Equipment / Week

EXPERTISE & CAPABILITIES 

In addition to methods and capacities for each equipment type, facilities must indicate their expertise and capabilities in the FM Management Plan. Think about how the employees know what they are doing. What makes them the experts compared to others that work at the Facility, or even others in the field? What equipment and resources are present to make the Facility and its employees able to perform these specific operations? 

An FM Management that includes these necessary details might look something like this:   

EQUIPMENT TYPE FMs IN EQUIPMENT TYPE METHODS CAPACITY (qty/time) EXPERTISE CAPABILITIES
LAPTOPS
  • Circuit Boards
  • Batteries
  • Mercury
– Testing & Repairing

_______

– Logical Data Sanitization (Wiping)

_______

– Sorting & Sending Downstream

_______

– Remove swollen batteries & package to be sent to DSV

XX Equip/Week

_______

XX Equip/Week

_______

XX Equip/Week

_______

XX Equip/Week

R2 Reuse Plan WISE-Certified Repair Technicians

Work Instruction XXX

_______

Data Sanitization Plan

Work Instruction XXX

_______

Work Instruction XXX

Work Instruction XXX

_______

Work Instruction XXX

Work Instruction XXX

Testing Computers & Testing Software

_______

Sanitizing Software & Hardware

_______

Forklifts,

Pallet Jacks

_______

Forklifts,

Pallet Jacks

DOWNSTREAM VENDORS

And don’t forget, all of this must be included in the FM Management Plan for each of the Downstream Vendors. It should map out which FM-containing equipment the downstream vendors manage and how they manage those equipment-types according to the Hierarchy. This graphic shows how an FM Management Plan might cover downstream vendors. 

As you can see, the FM Management Plan is meant to tell the story of what types of equipment are handled by the Facility, how they are handled at the Facility, and how they are handled downstream. A Facility’s FM Management Plan should be a sort of virtual tour of the Facility and the Downstream Vendors, allowing anyone to easily see the expertise, capabilities, methods, and capacity each equipment-type. 

As a final note, the FM Management Plan used as an example here is only one of many ways an FM management Plan might be laid out. The important thing to remember is that the FM Management Plan must include the expertise, capabilities, methods, and capacities for each type of FM-containing equipment. How the FM Management Plan displays this information is up to each Facility. 

Was this article helpful?
1 out Of 5 Stars

2 ratings

5 Stars 0%
4 Stars 0%
3 Stars 0%
2 Stars 0%
1 Stars 100%
5
How can we improve this article?
Please submit the reason for your vote so that we can improve the article.
Table of Contents
Go to Top